R025 - Muddy River Flood Control and Historic Preservation Project
Project | FY2019 State Bond Cap |
FY2019 Special Obligation Bond |
FY2019 Project Financed |
FY2019 Federal |
FY2019 Other Contributions |
FY2019 Total |
---|---|---|---|---|---|---|
Muddy River Flood Control and Historic Preservation Project |
300,000 | 0 | 0 | 2,600,000 | 0 | 2,900,000 |
Design and construction for Muddy River Restoration to improve flood control, improve water quality, enhance the aquatic and riparian habitat, and rehabilitate the landscape and historic resources.
Location: Boston