B202 - Solomon Carter Fuller Mental Health Center - Facade Repair/Elevator Upgrade
| Project | FY2017 State Bond Cap  | 
FY2017 Special Obligation Bond  | 
FY2017 Project Financed  | 
FY2017 Federal  | 
FY2017 Other Contributions  | 
FY2017 Total  | 
|---|---|---|---|---|---|---|
| Solomon Carter Fuller Mental Health Center - Facade Repair/Elevator Upgrade | 
6,225,000 | 0 | 0 | 0 | 0 | 6,225,000 | 
This funds the study, design and construction for repair/replacement of the existing failing facade. (Phase I) and elevator replacement.
Location: Boston