  • R112 - Lower Locks Buildings and Lee Pool Planning, Design and Construction


    Project
    FY2018
    State
    Bond
    Cap

    FY2018
    Special
    Obligation
    Bond

    FY2018
     
    Project
    Financed

    FY2018
     
     
    Federal

    FY2018
     
    Other
    Contributions

    FY2018
     
     
    Total
    Lower Locks Buildings and Lee Pool Planning, Design and Construction
     
    300,000 0 0 0 0 300,000

    Master Plan for Lee pool area of the Esplanade addressing the recreational needs of park users, maintenance needs of the Hatch Shell, repurposing of the Lee Pool area, as well as initial design and construction.

    Location: Boston

     
     