Project
FY2018
State
Bond
Cap

FY2018
Special
Obligation
Bond

FY2018
 
Project
Financed

FY2018
 
 
Federal

FY2018
 
Other
Contributions

FY2018
 
 
Total
Lower Locks Buildings and Lee Pool Planning, Design and Construction
 
300,000 0 0 0 0 300,000

Master Plan for Lee pool area of the Esplanade addressing the recreational needs of park users, maintenance needs of the Hatch Shell, repurposing of the Lee Pool area, as well as initial design and construction.

Location: Boston