40,246,644 | 0 | 0 | 0 | 0 | 40,246,644 |
Repair or replace assets within the rail right of way (ROW), including ties, rail, ballast, culverts, and switches, to avoid deterioration, keep or restore class of line, or maintain the lines' utility as part of a safe and reliable rail system.