T010 - Highway - Design, Environmental and Right of Way
Project | FY2018 State Bond Cap |
FY2018 Special Obligation Bond |
FY2018 Project Financed |
FY2018 Federal |
FY2018 Other Contributions |
FY2018 Total |
---|---|---|---|---|---|---|
Highway - Design, Environmental and Right of Way |
69,512,000 | 0 | 0 | 0 | 58,680,862 | 128,192,862 |
Costs associated with transportation construction projects, such as right of way, design, safety, bridge inspections, environmental permitting, and operations.
Location: Statewide