    State House - Water Infiltration Repairs - Phased
     
    3,200,000 0 0 0 0 3,200,000

    Study, design and construction for a multi-phased repair to address water infiltration issues at specific locations on the plaza and envelope at the State House.

    Location: Boston

     
     