R025 - Muddy River Flood Control and Historic Preservation Project
Project | FY2018 State Bond Cap |
FY2018 Special Obligation Bond |
FY2018 Project Financed |
FY2018 Federal |
FY2018 Other Contributions |
FY2018 Total |
---|---|---|---|---|---|---|
Muddy River Flood Control and Historic Preservation Project |
7,000,000 | 0 | 0 | 0 | 0 | 7,000,000 |
Design and construction for Muddy River Restoration to improve flood control, improve water quality, enhance the aquatic and riparian habitat, and rehabilitate the landscape and historic resources. Leverages Federal and local contributions.
Location: Boston