Study, design, and construction for a multi-phased repair to address water infiltration issues at specific locations on the plaza and envelope at the State House.

Fiscal Year
State Bond Cap
Non-Bond Cap
Operating Funds
Federal Funds
Other Funds
Total
FY2024
1,475,000
0
0
0
0
1,475,000
FY2024-FY2028 Total
2,975,000
0
0
0
0
2,975,000
Loading...