Policy Area | Transportation |
---|---|
Capital Agency | Transportation and Public Works |
Beneficiary Agency | Department of Transportation |
Location | Statewide |
T104
T104 Rail Reliability - Track and ROW
Repair or replace assets within the rail right of way (ROW), including ties, rail, ballast, culverts, and switches, to avoid deterioration, keep or restore class of line, and maintain the lines' utility as part of a safe and reliable rail system.
FY2022 State Bond Cap
FY2022 Non-Bond Cap
FY2022 Operating Funds
FY2022 Federal Funds
FY2022 Other Funds
FY2022 Total
28,868,778
0
0
0
0
28,868,778
Loading...