Study, design and construction for a multi-phased repair to address water infiltration issues at specific locations on the plaza and envelope at the State House.

FY2022 State Bond Cap
FY2022 Non-Bond Cap
FY2022 Operating Funds
FY2022 Federal Funds
FY2022 Other Funds
FY2022 Total
3,800,000
0
0
0
0
3,800,000
Loading...