Project | FY2018 State Bond Cap |
FY2018 Special Obligation Bond |
FY2018 Project Financed |
FY2018 Federal |
FY2018 Other Contributions |
FY2018 Total |
---|---|---|---|---|---|---|
DCAMM Lancaster and DMH Taunton Campus - Master Plan |
250,000 | 0 | 0 | 0 | 0 | 250,000 |
Study to develop a cohesive strategic vision for DCAMM's Lancaster Campus and the reuse of DMH Taunton Campus to maximize utilization. Cost is for study only.
Location: Lancaster