UMass Boston - Substructure Demolition / Quadrangle Development |
6,000,000 | 0 | 0 | 0 | 0 | 6,000,000 |
State share for study, design, demolition and renovations to address the deterioration of the existing parking garage and raised plaza at the center of the UMass Boston campus.
Location: Boston