Mass Bay Community College - Carey Building - HVAC Upgrades |
2,000,000 | 0 | 0 | 0 | 0 | 2,000,000 |
Study, design and construction for new HVAC systems to provide air conditioning to the top two floors, upgrades to portions of the existing HVAC system, and electrical and structural work.
Location: Wellesley