Project | FY2018 State Bond Cap |
FY2018 Special Obligation Bond |
FY2018 Project Financed |
FY2018 Federal |
FY2018 Other Contributions |
FY2018 Total |
---|---|---|---|---|---|---|
Mystic River Reservation Including Condon Shell Master Plan Implementation |
257,500 | 0 | 0 | 0 | 0 | 257,500 |
Design and construction for the Mystic River reservation system and the replacement of the Condon Shell.
Location: Medford