Project | FY2018 State Bond Cap |
FY2018 Special Obligation Bond |
FY2018 Project Financed |
FY2018 Federal |
FY2018 Other Contributions |
FY2018 Total |
---|---|---|---|---|---|---|
Winthrop Shores Restoration - Design and Construction |
6,300,000 | 0 | 0 | 0 | 0 | 6,300,000 |
Design and construction for shore protection, storm drainage, landscaping, parkways, benches, and shade shelter at Winthrop Shores.
Location: Winthrop