Project | FY2018 State Bond Cap |
FY2018 Special Obligation Bond |
FY2018 Project Financed |
FY2018 Federal |
FY2018 Other Contributions |
FY2018 Total |
---|---|---|---|---|---|---|
Hoosic River Flood Management and Revitalization |
150,000 | 0 | 0 | 0 | 0 | 150,000 |
Design and permitting of a new flood management system for the North and South Branches of the Hoosic River within North Adams to replace aging and deteriorating infrastructure.
Location: North Adams