| MCI Norfolk - Wastewater Repair | 
150,000 | 0 | 0 | 0 | 0 | 150,000 | 
This funds the study to analyze physical and operational issues of the wastewater grinding station and recommend a low cost, high quality solution.
Location: Norfolk