| McCormack Building Capital Renewal | 
500,000 | 0 | 0 | 0 | 0 | 500,000 | 
This project is for the study, design and construction of a Phased Capital Renewal of the McCormack Building. This project focuses on the existing buildings infrastructure, envelope, interior common spaces and surrounding site.
Location: Boston