UMass Boston Substructure Stabilization and Quad Development |
750,000 | 0 | 0 | 0 | 750,000 |
This funds the study that will address the deterioration of the 2 story parking garage and raised plaza at the heart of the UMass Boston Campus as well as provide for its subsequent replacement with a new landscaped campus quadrangle.
Location: Boston