Ponkapoag Golf Course Irrigation Design Engineering and Construction
 
2,000,000 0 0 0 2,000,000

This funds the design and construction costs at the Ponkapoag Golf Course for a restoration project to improve drainage and irrigation. Restoration will allow the course to open all 36 holes for public use.

Location: Canton